Drywall / Paint
The wires that needed moved have been. There are still wires and pipes some places that will be covered by the new crown molding.
350 SF of select grade oak stacked and ready to be installed.
Those 3/4" plumbing lines and the heat duct have been moved into the back wall.
New Andersen window at sink area and we raised the 2" plumbing vent, now the crown will cover it.
|