|
Demolition
We gutted the entire kitchen including the ceiling. There will be a 48" range going here with a pot filler so the chef will not have to carry large pots of water from the kitchen sink to the stove.
There were these large site built beams on the ceiling, you can still see where they were. The built-ins and mantle will be replace.
|